Here in the Southeast we spend an extraordinary amount of energy (and dollars) keeping cool during the hot humid Summers. And it's doubly painful since for many commercial customers utilities charge higher rates at the hottest times of the day.
But businesses, hospitals, hotels and big box stores can double the operating efficiency of their HVAC units at half the cost of replacing equipment by installing a Thermal~Flow Demand-Buster Evaporative Condenser Retrofit system. This energy efficiency retrofit will yield reductions of peak kW demand of 30% - 60%. And with many utilities offering financial incentive programs to commercial customers to reduce peak demand, the system can be very reasonable to implement, paying for itself in just a few years in savings.
One of our contractor clients installed a unit for a Home Depot store with a nearly new 20 ton air conditioner and realized significant savings immediately. Rick Bofinger of Jerico Mechanical said, "We achieved a 28.9% reduction in peak demand, and a 55% reduction in kWh, while actually INCREASING the capacity of the a/c unit."
Engineered for Commercial Roof-Top Retrofit Applications:
- Light Weight, Modular, Durable, Low Maintenance requiring no Structural Upgrades
- 30%-60% Reduction in Peak kW
- Up to 17 EER Performance
- Proven Commercial Water Cooled Technology with a Record of Operational Success
- 15 Year Limited Warranty
Patented Evaporative Fluid Cooler features:
- Construction: All fiberglass cabinet, cannot corrode. High quality materials throughout. High Efficiency evaporative design allows one tower to service multiple HVAC systems in Thermal-Loop.
- Water Spray Nozzles: Durable plastic, non-corrosive and non-fouling.
- Fans: Aluminum, epoxy coated frame, and precision balanced plastic blades for quiet, trouble-free service.
- Service: Easy access for routine maintenance

It's obvious that water mist cooling or sub-cooling saves alot of energy. The Demand Buster can pay for itself in a couple of years!
Posted by: Dennis | Aug 24, 2009 at 11:20 AM